Knowledge of road and bridge engineering: For the trackless transportation of slag in long tunnels, it is advisable to equip high-power, high-capacity, and advanced loading and unloading machinery and equipment to accelerate the construction progress.
2019-08-29
(1) Mechanical equipment should be selected and equipped in accordance with the principle of "advanced performance, reasonable matching, and emphasis on work efficiency", and in accordance with the technical requirements for mechanized construction of large cross-section (long) tunnels.
Read More
Construction precautions for steel formwork
In the construction of steel formwork, if the corresponding emergency and review work is not carried out according to the construction process, there will be many hidden dangers that can easily cause accidents. So the construction safety of steel formwork is also of utmost importance.
Certificate of honor
2019-09-17