Welcome to Luoyang Tengyu Tunnel Machinery Co., LTD.
Phone: +86 13872728636
+86 13837938839
Bidding Information
Trade News
Company News
Manufacturing requirements for formwork trolley
2019-02-25
The outer contour of formwork trolley shall ensure tunnel clearance after concrete pouring, and the clearance of door frame structure shall ensure safe passage of vehicles and personnel inside the tunnel.
Read More
Key points of making tunnel lining formwork trolley
The second lining construction (including the widening section) should adopt the whole hydraulic automatic walking lining trolley, the lining trolley should have accurate structure size, all kinds of telescopic components, hydraulic system, electrical control system running well, reasonable setting of supporting mechanisms; It should meet the requirements of automatic walking and have a locking device to ensure accurate positioning.
Common types of tunnel lining formwork
The common types of lining formwork are: integral mobile formwork trolley, traversing (separate moving) formwork trolley, assembled arch formwork.
衬砌台车如何出模
2021-04-13
衬砌台车如何出模呢?今天,小编就和大家介绍下实际操作。
衬砌台车操作安全要求有哪些
2021-04-16
衬砌台车作业人员使用台车前需要一定的安全知识,下面为大家讲解下台车操作的安全要求。